...
首页> 外文期刊>Hydro Review Worldwide >RusHydro completes stabilization work on Zagorskaya 2 pumped-storage plant
【24h】

RusHydro completes stabilization work on Zagorskaya 2 pumped-storage plant

机译:RusHydro完成Zagorskaya 2抽水蓄能电站的稳定工作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Russian energy giant JSC RusHydro has completed stabilization work on the Zagorskaya 2 pumped-storage plant. HydroWorld.com reports that erosion of foundation soil under the 840 MW plant was caused by the "inefficient performance" of its impervious system after workers noticed water seeping into Zagorskaya 2's turbine room. The turbine room and other areas were flooded via broken expansion joints and intakes of unfinished water pipes, caused by soil erosion that made the building sag.
机译:俄罗斯能源巨头JSC RusHydro已完成Zagorskaya 2抽水蓄能电站的稳定工作。 HydroWorld.com报道称,在工人注意到Zagorskaya 2透平机房中有水渗入后,该840 MW电厂下的基础土壤受到侵蚀是由于其防渗系统的“效率低下”。透平机房和其他区域因断裂的膨胀缝和未完成的水管而被淹没,这是由于水土流失导致建筑物下陷。

著录项

  • 来源
    《Hydro Review Worldwide》 |2014年第6期|35-35|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号