...
首页> 外文期刊>Hydro Review Worldwide >Rehabilitation of Turbines at the Ohakuri Hydro Power Station
【24h】

Rehabilitation of Turbines at the Ohakuri Hydro Power Station

机译:Ohakuri水力发电站涡轮机的修复

获取原文
获取原文并翻译 | 示例

摘要

Ohakuri Hydro Power Station in the North Island of New Zealand is the second of nine hydropower stations on the Waikato River owned and operated by Mighty River Power Limited. The Ohakuri plant contains four 28 MW Francis turbines designed and built by Dominion Engineering. The turbines were commissioned in 1961 and were operated through to 2011 without any major rehabilitation work. All four machines have had new turbine equipment installed with the fourth and final machine completed in April 2014. The main project objectives of modernizing the turbines and increasing performance have been achieved.
机译:新西兰北岛的奥卡库里水电站是怀特卡托河上九座水力发电站中的第二座,由威武河电力有限公司拥有并运营。 Ohakuri工厂包含由Dominion Engineering设计和制造的四台28 MW弗朗西斯水轮机。这些涡轮机于1961年投入使用,一直运行到2011年,没有进行任何重大的修复工作。所有四台机器都安装了新的涡轮机设备,第四台和最后一台机器已于2014年4月完成。实现了涡轮机现代化和提高性能的主要项目目标。

著录项

  • 来源
    《Hydro Review Worldwide 》 |2014年第4期| 12-1416| 共4页
  • 作者

    Glen Twining;

  • 作者单位

    Mighty River Power Limited in New Zealand;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号