Once the publicly advertised bid package for the construction of a public housing project was issued and the bids were publicly opened, the issuing housing authority could not then modify the bid package to request bidders to revise their bid estimates based on the prevailing residential construction wage rates as opposed to those for commercial construction.
展开▼