...
首页> 外文期刊>Housing and development reporter >UPDATES FROM THE NATIONAL MULTIFAMILY HOUSING COUNCIL
【24h】

UPDATES FROM THE NATIONAL MULTIFAMILY HOUSING COUNCIL

机译:来自国家多摩性房委员会的更新

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey. Of this group, 85% reported delays in permitting due to coronavirus (COVID-19), up from 77% in round two (conducted April 9-14) and 76% in the initial survey (conducted March 27-April 1). Survey respondents reporting construction delays also indicated a significant pause in starts, with 78% reporting delays, up 8 percentage points from the end of April, and 19 percentage points from the first round.
机译:据国家多型住房委员会第三版(NMHC)Covid-19施工调查,超过一半的多型开发人员受访者报告了他们经营的司法管辖区的建设延误。在本集团中,85%报告的延迟持续呼吸冠心病(Covid-19),在初始调查中(4月9日至4月9日至4月9日至4月9日至4月9日至4月9日),达到77%(第1月27日至4月1日进行)。调查受访者报告施工延误也表明,开始暂停,报告延误78%,从4月底增长了8个百分点,从第一轮百分点有19个百分点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号