首页> 外文期刊>Highways >Ringway races to top of the league with final quarter surge
【24h】

Ringway races to top of the league with final quarter surge

机译:Ringway在最后四分之一的比赛中跃居联盟之首

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Ringway started this year as the French-owned roads contracted ended the last one by winning the most amount of roads work in the last quarter and has secured pole position in the annual top 20. According to Glenigan's latest exclusive quarterly orders survey for Highways, Ringway drove off with nearly half a billion pounds worth of/ roads work in the first quarter of this year. With Balfour Beatty trailing in at eighth place in the quarterly table with a £48 million order book, Ringway has overtaken the UK's biggest contractor and secured top slot in the annual table.
机译:Ringway于今年开始运营,这是因为法国所拥有的合同公路在最后一个季度赢得了最多的道路工程,从而结束了最后一条道路,并在年度前20名中获得了杆位。根据Glenigan最新的高速公路独家季度订单调查,Ringway在今年第一季度,道路工程的总价值接近10亿英镑。巴尔福·比蒂(Balfour Beatty)凭借4,800万英镑的订单额排在季度表的第八位,Ringway已超越英国最大的承包商,并在年度表中获得头把交椅。

著录项

  • 来源
    《Highways》 |2012年第4期|p.12-13|共2页
  • 作者

    Steve Menary;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号