...
首页> 外文期刊>Heating & Ventilating Review >Going for gold with prefab pipework
【24h】

Going for gold with prefab pipework

机译:用预制管道去淘金

获取原文
获取原文并翻译 | 示例

摘要

For Conex Baenninger that meant a 'race' of a different kind, one that tested its ability to deliver bespoke fabricated pipework manufactured in large quantities and to a high specification.What was required, for OEM customer Heatrae Sadia Heating, was the pre-plumb pipework for thousands of unvented hot water cylinders to be installed in apartments in the Athletes' Village.The water storage and domestic services units are connected directly to the cold water supply and deliver readily-available hot water at mains pressure.Adding to the complexity, there were eight variants of the cylinder, all meaning significant changes.Ian Wilson, OEM technical sales manager (TSM) for Conex Baenninger, said: "Our engineers looked at how we could manufacture the full set of pipework, minimising the use of compression and other fittings. This made the pipework bespoke and, where possible, joint free or with a drastically reduced number of joints.
机译:对于Conex Baenninger来说,这是另一种“竞赛”,它测试了其交付量身定制的,定制的,高规格制造的管道的能力。 r nOEM客户Heatrae Sadia Heating需要的是在运动员村的公寓中安装了成千上万个未通风热水瓶的预铅直管道。 r n储水和家庭服务单元直接连接至冷水供应,并以市压提供随时可用的热水。 r n除了增加了复杂性外,还有八种不同的气缸,这都意味着重大的变化。 r nConex Baenninger的OEM技术销售经理(TSM)Ian Wilson说:“我们的工程师正在研究如何制造全套管道,最大程度地减少压缩和其他配件的使用,从而使管道定制化,并在可能的情况下实现自由连接或接头数量大大减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号