首页> 外文期刊>Hansa >Lng Carrier Fleet Hits 300 Mark
【24h】

Lng Carrier Fleet Hits 300 Mark

机译:Lng航母舰队命中300马克

获取原文
获取原文并翻译 | 示例
       

摘要

It took 34 years for the in-service fleet of LNG carriers to reach 100 vessels and a further eight years for it to break through the 200-vessel barrier.Now,the 300-ship mark has been reached just over two and one-half years later,according to LNG World Shipping,the specialist London-based publication devoted to LNG carrier design,construction and operation and the LNG ship trades. The 155,000 m~3 membrane tank vessel Tangguh Jaya became the 300th member of the current fleet of gas carriers engaged in the deepsea movement of LNG on its delivery by Samsung Heavy Industries (SHI) to K Line and PT Meratus Line on 29 December 2008.The 200th ship in the LNG carrier fleet,the 145,000 m~3 Maersk Qatar,was also delivered by SHI,on 15 April 2006.
机译:使用中的液化天然气运输船队用了34年的时间才能达到100艘船,再过8年才突破了200艘船的障碍。现在,300船大关已经超过了两分之一和二分之一。多年后,根据《 LNG世界航运》,伦敦的专业出版物专门从事LNG船的设计,建造和运营以及LNG船舶贸易。 155,000 m〜3的膜罐船Tangguh Jaya成为当前从事LNG深海运输的天然气运输船队的第300名成员,该运输船由三星重工业(SHI)于2008年12月29日交付给K线和PT Meratus线。 SHI于2006年4月15日交付了液化天然气运输船队中的第200艘船,即145,000 m〜3马士基卡塔尔。

著录项

  • 来源
    《Hansa》 |2009年第1期|p.11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 ger
  • 中图分类 水路运输;
  • 关键词

  • 入库时间 2022-08-18 01:40:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号