首页> 外文期刊>GPS World >Lockheed Martin Completes Gps Ⅲ Ibr
【24h】

Lockheed Martin Completes Gps Ⅲ Ibr

机译:洛克希德·马丁完成GpsⅢIbr

获取原文
获取原文并翻译 | 示例
           

摘要

The Lockheed Martin team developing the GPS Ⅲ satellites has successfully completed on schedule an integrated baseline review (IBR) with the U.S. Air Force, a step that precedes the preliminary design review, according to the company. The IBR consisted of a comprehensive review of the entire program and established a reliable baseline in relation to the program's cost, schedule, and technical requirements.The Lockheed Martin GPS Ⅲ team, which includes ITT and General Dynamics Advanced Information Systems, is on track to complete the space vehicle preliminary design review in the second quarter of 2009, the company said.
机译:洛克希德·马丁公司开发GPSⅢ号卫星的团队已按计划成功完成了与美国空军的综合基线审查(IBR),这是初步设计审查之前的一步。 IBR包括对整个计划的全面审查,并根据计划的成本,进度和技术要求建立了可靠的基准。洛克希德·马丁GPSⅢ小组(包括ITT和通用动力高级信息系统)正在朝着目标迈进。该公司表示,该公司已于2009年第二季度完成了航天器的初步设计审查。

著录项

  • 来源
    《GPS World》 |2008年第12期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 测绘学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号