首页> 外文期刊>Global Railway?Review >An alternative overhead system: the Rigid Overhead Conductor-rail System (ROCS)
【24h】

An alternative overhead system: the Rigid Overhead Conductor-rail System (ROCS)

机译:另一种高架系统:刚性架空导线系统(ROCS)

获取原文
获取原文并翻译 | 示例
           

摘要

THE COSTS of the recent UK mainline electrification projects have attracted much adverse publicity, resulting in delays to projects and the cancellation of future electrification projects. A look at the way electrification infrastructure projects spent their budgets shows that a major chunk of overall cost was associated with achieving 25kV electrification on the existing Victorian infrastructure. A lot of stations, bridges and tunnels cannot achieve compliant electrical clearances required for a 25kV electrification system as they were never designed to accommodate electrified stock in the first place.
机译:英国最近的干线电气化项目的成本引起了极大的反响,导致项目延误和取消未来的电气化项目。通过对电气化基础设施项目预算的使用方式的调查可以看出,总成本的很大一部分与在现有维多利亚州基础设施上实现25kV电气化有关。许多车站,桥梁和隧道无法达到25kV电气化系统所需的标准电气间隙,因为它们最初并未设计成可容纳电气仓库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号