...
首页> 外文期刊>GHG transactions/technologies >Epri To Work With Utilities To Overcome Ccs Retrofit Issues
【24h】

Epri To Work With Utilities To Overcome Ccs Retrofit Issues

机译:Epri与公用事业合作解决Ccs改造问题

获取原文
获取原文并翻译 | 示例
           

摘要

configuration," determine the space needed for such technology, "estimate performance and costs," and "assess the features of each plant that materially affect the cost and feasibility" of the retrofit, according to a Jan. 27 statement from EPRI announcing the project. "The ultimate purpose of this research is to help our nation meet the growing demand for energy and reduce greenhouse gas emissions," Great River Energy Vice President of Generation Rick Lancaster said.
机译:根据EPRI在1月27日宣布该项目的声明,“配置”,“确定此类技术所需的空间,“估算性能和成本”,以及“评估每个工厂的特性,这些特性会严重影响成本和可行性”。 “这项研究的最终目的是帮助我们的国家满足对能源不断增长的需求并减少温室气体排放,” Great River Energy发电副总裁Rick Lancaster说。

著录项

  • 来源
    《GHG transactions/technologies》 |2009年第4期|3-4|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号