首页> 外文期刊>The Leading Edge >A new, fully integrated method for seismic geohazard prediction ahead of the bit while drilling
【24h】

A new, fully integrated method for seismic geohazard prediction ahead of the bit while drilling

机译:一种完全集成的新方法,可在钻进时在钻头之前预测地震地质灾害

获取原文
获取原文并翻译 | 示例
       

摘要

Geohazards create safety risks and increase drilling costs. Many are caused by uncertainties in the estimated formation pressures and the locations of geological structures. We introduced a new technique that decreases these uncertainties ahead of the bit during drilling. The method involves integration of surface seismic data, LWD or wireline well data, rock-physics information, logistics and planning, and fast turnaround times for "in-time" results.
机译:地质灾害带来安全风险并增加钻井成本。许多原因是由于估算的地层压力和地质构造的位置不确定。我们引入了一种新技术,可在钻探过程中减少钻头之前的这些不确定性。该方法涉及地表地震数据,随钻测井或电缆井数据,岩石物理信息,物流和计划的集成,以及“实时”结果的快速周转时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号