首页> 外文期刊>Generation, Transmission & Distribution, IET >Penalised quoted cost based approach on transmission loss allocation for a bilateral contract in deregulated electricity market
【24h】

Penalised quoted cost based approach on transmission loss allocation for a bilateral contract in deregulated electricity market

机译:电力市场放松管制下双边合同输电损失分配的基于报价的惩罚性成本法

获取原文
获取原文并翻译 | 示例
           

摘要

Supplying transmission losses economically under bilateral contract is a challenge for power engineers. In this study, penalised quoted cost (PQC) based approach is proposed where generators will participate for supplying the transmission losses which may be incurred from their customers through their bilateral contracts in a deregulated electricity market. The loss supplying generators will quote the cost and the quantum of real power that can be supplied by them to independent system operator (ISO) in a day-ahead market. This study presents a lucid approach for loss allocation economically by ranking the loss supplying generators based on their PQC. Penalty factor for each loss supplying generator is calculated using the loss coefficients. ISO will meet the losses due to bilateral contracts in an economical way by selecting the generators with minimum PQC and the associated cost is allocated to the individual transactions based on loss contribution fraction. The proposed algorithm is tested using a sample four-bus system and IEEE 30 bus system using MATLAB R2014a. This method is based on the participation of generators and their given quotation in transmission loss allocation process. The study gives both the real power loss/cost allocation to the generators and for individual transactions.
机译:在双边合同下经济地提供传输损耗对电力工程师来说是一个挑战。在这项研究中,提出了一种基于惩罚性报价(PQC)的方法,在这种方法中,发电商将参与提供输电损失,这可能是由于客户在解除管制的电力市场中通过其双边合同从其客户那里蒙受的损失。损失供应发生器将报价并在日前市场中将其提供给独立系统运营商(ISO)的成本和有功功率的数量。这项研究通过根据损失提供者的PQC对其进行排名,为经济分配损失提供了一种清晰的方法。使用损耗系数计算每个提供损耗的发生器的惩罚因子。 ISO将通过选择具有最低PQC的发电机,以经济的方式弥补因双边合同造成的损失,并根据损失贡献率将相关成本分配给各个交易。使用示例四总线系统和使用MATLAB R2014a的IEEE 30总线系统对提出的算法进行了测试。此方法基于发电机及其参与的报价在输电损耗分配过程中的参与。该研究既给出了发电机的实际功率损耗/成本分配,又给出了单独的交易。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号