首页> 外文期刊>Generation, Transmission & Distribution, IET >Capacity withholding assessment in the presence of integrated generation and transmission maintenance scheduling
【24h】

Capacity withholding assessment in the presence of integrated generation and transmission maintenance scheduling

机译:在集成发电和输电维护计划的情况下进行容量扣留评估

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In oligopoly power markets, maintenance of equipments may be scheduled strategically for exercising capacity withholding. In this study, an approach for analysing the capacity withholding of generation companies (GenCos) considering integrated generation and transmission maintenance scheduling (IGTMS) is proposed. This approach is based on some indices, which compare different types of power markets to analyse the effect of IGTMS on the capacity withholding of GenCos. The indices provide valuable information about capacity withholding, nodal price distortion, wealth transfer and loss of social welfare. The complex interactions of IGTMS with the capacity withholding of GenCos are provided with assessing extensive numerical simulations on two IEEE test systems.
机译:在寡头垄断的电力市场中,可以策略性地安排设备的维护,以行使停电能力。在这项研究中,提出了一种分析发电公司(GenCos)考虑综合发电和输电维护计划(IGTMS)的容量扣留的方法。该方法基于一些指数,该指数比较了不同类型的电力市场,以分析IGTMS对GenCos容量扣留的影响。这些指数提供了有关容量扣留,节点价格扭曲,财富转移和社会福利损失的宝贵信息。通过评估两个IEEE测试系统上的大量数值模拟,可以提供IGTMS与GenCos的容量保留之间的复杂交互。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号