首页> 外文期刊>International Transactions on Electrical Energy Systems >Integrated generation and transmission maintenance scheduling by considering transmission switching
【24h】

Integrated generation and transmission maintenance scheduling by considering transmission switching

机译:考虑传输切换的综合发电和传输维护计划

获取原文
获取原文并翻译 | 示例
           

摘要

This paper models and investigates the incorporation of economic transmission switching (TS) into integrated generation and transmission maintenance scheduling (IMS) and the effect of transmission switching on integrated maintenance scheduling (IMSwTS). To ensure security of power system over maintenance horizon, N-1 criteria is considered in the model. The N-1 secure IMSwTS problem is formulated as a mixed-integer linear programming model (MILP). The MILP model of this paper cannot be solved with commercial solver in a reasonable time; therefore, with the aim of solving high computational burden, the model is decomposed into TS subproblem and IMS subproblem, and each subproblem variables related to other subproblem is fixed. The proposed model and decomposition approach are implemented on IEEE modified 24-bus reliability test system and solved by using the CPLEX solver under GAMS modeling environments. The results demonstrate that considering TS in IMS alters the maintenance schedule and brings cost saving.
机译:本文建模并研究了将经济传输切换(TS)纳入集成的发电和传输维护调度(IMS)中以及传输切换对集成维护调度(IMSwTS)的影响。为了确保电力系统在维护期内的安全性,模型中考虑了N-1个标准。 N-1安全IMSwTS问题被表述为混合整数线性规划模型(MILP)。本文的MILP模型无法在合理的时间内用商业求解器进行求解。因此,为了解决高计算量的问题,将模型分解为TS子问题和IMS子问题,并将与其他子问题相关的每个子问题变量固定下来。提出的模型和分解方法在IEEE改进的24总线可靠性测试系统上实现,并在GAMS建模环境下使用CPLEX求解器进行求解。结果表明,在IMS中考虑TS可以更改维护计划并节省成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号