Comprehensively considering the operation cost and safety constraints of nuclear power, an optimal operation scheme of large-scale nuclear power plant participating in peak load regulation of power system is proposed. After quantitatively analysing the peak load regulation cost of nuclear power, the optimal objective is set to minimise the total operation cost including the fuel cost, the start-stop cost, and the peak load regulation cost. On the basis of the normal constraints of power scheduling, safety constraints of the nuclear power unit's daily output performance and power characteristic constraints of the pumped storage unit are considered. The mixed integer programming method is used to achieve the solution of the optimal operation scheme. Simulation results from a regional power system show that the proposed optimal operation scheme can effectively reflect the real characteristic of nuclear power and apply to power dispatching analysis under the background of the large-scale access of nuclear power. In comparison to other two typical schemes of peak load regulation, the proposed optimal operation scheme of peak load regulation is more economic and efficient.
机译:综合考虑核电的运行成本和安全约束,提出了参与核电系统峰值负荷调节的大型核电站最优运行方案。在对核电的峰值负荷调节成本进行定量分析之后,设定最佳目标,以使包括燃料成本,起止成本和峰值负荷调节成本在内的总运营成本降至最低。在电力调度的常规约束的基础上,考虑了核电机组日输出性能的安全约束和抽水蓄能机组的功率特性约束。使用混合整数规划方法来实现最优运算方案的求解。区域电力系统的仿真结果表明,提出的最优运行方案能够有效地反映核电的真实特性,并在核电大规模接入的背景下,应用于电力调度分析。与其他两种典型的峰值负荷调节方案相比,提出的最佳峰值负荷调节方案更加经济高效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号