首页> 外文期刊>Fusion Science and Technology >Operation Experience With The Asdex Upgrade Ecrh System
【24h】

Operation Experience With The Asdex Upgrade Ecrh System

机译:Asdex Upgrade Ecrh系统的操作经验

获取原文
获取原文并翻译 | 示例
           

摘要

In 1989 the planning for a 140-GHz, 2-MW, 2-s electron cyclotron resonance heating system for ASDEX Upgrade started. These plans were finally approved in 1993. The system comprises four gyrotrons with four separate transmission lines and launchers. Although a 0.5-s test gyrotron was already installed in autumn 1994, it was only in summer 1997 when the first gyrotron of the final system was ready for use in the experiments, and in spring 2000 the system was completed with all four gyrotrons. This paper reviews the experience gained in construction and operation of this system. In particular, we describe how we solved problems with external magnetic fields affecting gyrotron operation. These fields originate both from the tokamak and from the cryomagnet of adjacent gyrotrons. We also report about the gyrotron performance, our techniques for the alignment of the transmission lines, the calibration of the polarizer mirrors, and the power calibration.
机译:1989年,开始为ASDEX升级计划140 GHz,2 MW,2 s电子回旋共振加热系统。这些计划最终于1993年获得批准。该系统包括四个回旋管,分别具有四个独立的传输线和发射器。尽管在1994年秋天已经安装了一个0.5秒的测试回旋管,但是直到1997年夏天,最终系统的第一个回旋管才准备在实验中使用,并在2000年春季完成了所有四个回旋管的系统。本文回顾了在该系统的构建和运行中获得的经验。特别是,我们描述了如何解决影响回旋管运行的外部磁场问题。这些场既来自托卡马克,也来自相邻回旋管的低温磁网。我们还报告了回旋管的性能,传输线对准的技术,偏振镜的校准以及功率校准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号