首页> 外文会议>International Conference on Infrared, Millimeter, and Terahertz Waves >Operation and upgrade of the ECRH system at ASDEX upgrade
【24h】

Operation and upgrade of the ECRH system at ASDEX upgrade

机译:通过ASDEX升级操作和升级ECRH系统

获取原文

摘要

The upgraded Electron Cyclotron Resonance Heating (ECRH) system at ASDEX Upgrade (AUG) has been routinely used in the last experimental campaign. A further upgrade will replace an existing system of four short-pulse (140 GHz, 2s, 500 kW) gyrotrons. The final goal is to have around 6.5-7 MW at 140 GHz (or 5.5 MW at 105 GHz) from 8 units available in the plasma during the whole AUG discharge (10 s).
机译:在上一个实验活动中,例行使用了经过ASDEX升级(AUG)升级的电子回旋共振加热(ECRH)系统。进一步的升级将取代现有的四个短脉冲(140 GHz,2s,500 kW)回旋管系统。最终目标是在整个AUG放电(10 s)期间,从等离子体中的8个单位中获得140 GHz时约6.5-7 MW(或105 GHz时为5.5 MW)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号