The ITER Council has approved changes to the ITER design proposed by the ITER Organization and a slippage to the schedule of 2 years. Completion of construction is now targeted for 2018. The design changes and schedule slippage, along with inflationary costs of some raw materials, is projected to increase the ITER cost estimate (termed "resource estimate" by the ITER Organization). The Council ordered an independent review of the resource estimates by an international committee to be chaired by Dr. Frank Briscoe of the European Union. The U.S. had previously announced that it expected the cost of its ITER contribution would increase by at least 30 percent, to at least $1.45 billion.
机译:国际热核实验堆理事会已经批准了对国际热核实验堆组织提议的国际热核实验堆设计的更改,并推迟了2年的时间表。现在的目标是在2018年完成建设。设计变更和进度表的延误,以及某些原材料的通货膨胀成本,预计将增加ITER成本估算(由ITER组织称为“资源估算”)。理事会命令由一个国际委员会对资源估计数进行独立审查,该委员会将由欧洲联盟的弗兰克·布里斯科(Frank Briscoe)博士主持。美国此前曾宣布,它预计其ITER捐助的成本将增加至少30%,至少达到14.5亿美元。

著录项

  • 来源
    《Fusion Power Report》 |2008年第8期|p.26|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 原子能技术;
  • 关键词

  • 入库时间 2022-08-17 23:42:43

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号