...
首页> 外文期刊>Fresenius Environmental Bulletin >ASSESSMENT OF LIMITING FACTORS FOR POTENTIAL ENERGY PRODUCTION IN WASTEn TO ENERGY PROJECTS
【24h】

ASSESSMENT OF LIMITING FACTORS FOR POTENTIAL ENERGY PRODUCTION IN WASTEn TO ENERGY PROJECTS

机译:能源项目中潜在能源生产的限制因素评估

获取原文
获取原文并翻译 | 示例

摘要

The popularity of landfill gas to energy projects increased worldwide as well as in Turkey in the last two decades due to the importance of renewable energy sources and the green house gas emission control in environmental protection. Many Waste-to-Energy (WTE) projects focus on methods that employ landfill gas (LFG) from landfills to produce electric power. Most of the projects refer to gas prognosis models such as USEPA-LandGEM, GasSim, EPER, and IPCC to determine the installation power capaci
机译:在过去的二十年中,由于可再生能源和温室气体排放控制在环境保护中的重要性,垃圾填埋气在能源项目中的受欢迎程度在全球范围内以及在土耳其日益增加。许多废物转化为能源(WTE)项目的重点是利用垃圾掩埋场的垃圾填埋气(LFG)产生电力的方法。大多数项目都参考诸如USEPA-LandGEM,GasSim,EPER和IPCC等气体预测模型来确定安装功率

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号