...
首页> 外文期刊>Fire >BIM there, done that?
【24h】

BIM there, done that?

机译:BIM在那里,做到了吗?

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In our recent review of the second edition of the CIC BIM protocol (Second Helpings) we noted references to an Asset Information Model (AIM) which had been introduced into the second edition and suggested that the implications of using the protocol for the Facilities Management (FM) phase of a project needed to be worked through. In this article we consider how Building Information Modelling (BIM) will operate during the FM phase and the practical issues that this raises. Given that the application of BIM to existing assets is bound to be more extensive and consequently involve greater resource than the application of BIM to new build alone, it is important to understand the structure of the underlying PAS 1192-3 and the practical issues that arise.
机译:在我们最近对CIC BIM协议第二版(第二篇帮助)的评论中,我们注意到对第二版中引入的资产信息模型(AIM)的引用,并提出了将该协议用于设施管理的含义( FM)项目阶段需要进行。在本文中,我们考虑了建筑信息模型(BIM)在FM阶段如何运行以及由此引发的实际问题。鉴于BIM在现有资产上的应用必将更加广泛,因此比BIM仅在新建筑中的应用所涉及的资源更多,因此了解基础PAS 1192-3的结构以及出现的实际问题非常重要。 。

著录项

  • 来源
    《Fire》 |2018年第1410期|52-53|共2页
  • 作者

    Simon Lewis; Vicky McCombe;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号