首页> 外文期刊>Fire prevention >Setting the agenda
【24h】

Setting the agenda

机译:设定议程

获取原文
获取原文并翻译 | 示例
           

摘要

The fire Sector Summit is now a much-anticipated date on the industry's calendar and this year the FPA held events over two days at picturesque Whittlebury Hall in Northamptonshire.The first day featured an FPA member event that contained insightful seminar sessions from the BBC on improving fire safety in international premises, an update by FPA associate trainer Mike Floyd on revisions to BS 5839: 2013: Fire detection and fire alarm systems for buildings. Code of practice for design, installation, commissioning and maintenance of systems in non-domestic premises, and a case study from Brent Housing Partnership on an £8 million fire safety works programme.
机译:消防部门峰会现在是业界备受期待的日期,今年FPA在北安普敦郡风景如画的Whittlebury Hall举行了为期两天的活动。 FPA助理培训师Mike Floyd对BS 5839:2013的修订进行了更新,以了解国际场所的消防安全。非住宅场所系统设计,安装,调试和维护的业务守则,以及来自Brent Housing Partnership的800万英镑消防安全工程计划案例研究。

著录项

  • 来源
    《Fire prevention》 |2013年第11期|24-26|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号