首页> 外文期刊>Federal Facilities Environmental Journal >The Joint Readiness Training Center and Fort Polk Installation Internal Environmental Assessment Program
【24h】

The Joint Readiness Training Center and Fort Polk Installation Internal Environmental Assessment Program

机译:联合准备训练中心和波尔克堡安装内部环境评估计划

获取原文
获取原文并翻译 | 示例
       

摘要

For years, the Army has recognized the value of conducting internal environmental assessments as a means to attain, sustain, and monitor compliance with applicable federal, state, Army, and local environmental regulations. Army Regulation (AR) 200-1, "Environmental Protection and Enhancement," requires all installations to conduct internal assessments using established Army-approved protocols. Historically, to comply with the Army's internal assessment requirement, Fort Polk conducted periodic compliance inspections of those installation organizations and facilities using hazardous materials or generating hazardous waste. The compliance inspections resulted in a reduction in the number of installation compliance deficiencies identified by federal, state, and Army compliance inspectors during external inspections. Although the periodic compliance inspections met the intent and regulatory requirements of AR 200-1, the opportunity existed to expand compliance inspections and develop a more comprehensive internal assessment program. To that end, Fort Polk developed the Internal Environmental Assessment Program (IEAP) in 2004.
机译:多年来,陆军已经认识到进行内部环境评估的价值,可以达到,维持和监视对适用的联邦,州,陆军和地方环境法规的遵守情况。陆军法规(AR)200-1“环境保护和改善”要求所有设施均使用已建立的陆军批准的协议进行内部评估。从历史上看,为了符合陆军内部评估要求,波尔克堡对使用危险材料或产生危险废物的安装组织和设施进行了定期合规检查。遵从性检查减少了联邦,州和陆军遵从性检查员在外部检查期间发现的安装遵从性缺陷数量。尽管定期的合规性检查符合AR 200-1的意图和法规要求,但仍有机会扩大合规性检查并制定更全面的内部评估计划。为此,Fort Polk于2004年制定了内部环境评估计划(IEAP)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号