...
首页> 外文期刊>European Journal of Environmental and Civil Engineering >Hydraulic performance, wave loading and response of PBA revetments and their foundations
【24h】

Hydraulic performance, wave loading and response of PBA revetments and their foundations

机译:PBA护岸及其基础的水力性能,波浪载荷和响应

获取原文
获取原文并翻译 | 示例

摘要

Polyurethane bonded aggregate (PBA) revetments are highly porous structures made of crushed stones durably and elastically bonded by polyurethane (PU). Despite their advantages compared with conventional revetments and the experience available from more than 25 pilot projects, design formulae to predict their hydraulic performance, wave loading and response are still lacking. Therefore, the paper addresses the analysis of large-scale tests performed in the Large Wave Flume (GWK) of Hanover/Germany. The study aims at improving the understanding of the processes involved in the interaction between wave, revetment and foundation and at developing the missing design formulae for a broad range of wave conditions. The analysis of an observed failure due to transient soil liquefaction under regular waves is also described.Les revêtements PBA (polyurethane bonded aggregate) sont des structures très poreuses composées d‘agrégats liés durablement et élastiquement par du Polyurethane (PU). Malgré les avantages de ce type de revêtement et l’expérience de plus de 25 projets pilotes, il n’existe toujours pas des formules de dimensionnement pour le calcul de leur performance hydraulique, des efforts de houle ainsi que de leur réponse à ces efforts. C’est pourquoi cette étude est consacrée à l’analyse des essais à grande échelle dans le Grand Canal à Houle (GWK) de Hanovre/Allemagne. Ces essais visent à améliorer les connaissances relatives aux processus liés à l’interaction entre la houle, le revêtement et sa fondation et à développer les formules de dimensionnement pour une large gamme de conditions de houle. L’analyse d’un cas de rupture cause en houles régulières par une liquéfaction transiente est aussi inclue.View full textDownload full textKeywordsPBA revetments, wave reflection, wave run-up/run-down, breaking waves, wave impact loads, wave-induced pore pressure, transient soil liquefactionMots-clésRevêtement PBA, réflexion de houle, ascension de houle, houles déferlantes, effort d’impact de houle, pression interstitielle, liquéfaction de sol transienteRelated var addthis_config = { ui_cobrand: "Taylor & Francis Online", services_compact: "citeulike,netvibes,twitter,technorati,delicious,linkedin,facebook,stumbleupon,digg,google,more", pubid: "ra-4dff56cd6bb1830b" }; Add to shortlist Link Permalink http://dx.doi.org/10.1080/19648189.2012.688604
机译:聚氨酯粘结骨料(PBA)护岸是由碎石经聚氨酯(PU)持久且弹性粘结而成的高度多孔的结构。尽管与常规护岸相比它们具有优势,并且拥有超过25个试点项目的经验,但仍缺乏预测其水力性能,波浪载荷和响应的设计公式。因此,本文着重分析在德国汉诺威的大水槽(GWK)中进行的大型测试。该研究旨在增进对波浪,护岸和地基之间相互作用的过程的了解,并针对广泛的波浪条件开发缺失的设计公式。还描述了由于在规则波浪作用下短暂的土壤液化而导致的观察到的破坏分析。LesrevétementsPBA(聚氨酯粘结的骨料)结构由孔隙构成,具有持久性等。聚氨酯(PU)。马尔代夫发展与发展计划的高级专家,共有25名项目飞行员,但目前还没有绩效考核计划,而努尔·勒阿努尔·勒努尔做出反应。最好的pourquoi cetteétude estconsacréeÃlâ€analyse des essaisÃàGrandeéchelle dans le大运河äHoule(GWK)de Hanovre / Allemagne。 Céessais参观了阿利奥勒·莱·莱·科斯纳斯亲戚,过程互动,亲戚互动,亲子互动,亲子互动,以及大型游戏条件。 L’cas cas cascas de casca de casca de casca decaúléde laréquede la de la de la de la de la de la delégé ,波浪冲击载荷,波浪引起的孔隙压力,瞬态土壤液化Mots-clésRevÃtetementPBA,屈曲de houle,扬升de houle,houlesdéferlantes,努力dâimpactde houle,压制间隙,liquéfactionde soltransienteRelated var addthis_config = {ui_cobrand:“泰勒和弗朗西斯在线”,services_compact:“ citeulike,netvibes,twitter,technorati,delicious,linkedin,facebook,stumbleupon,digg,google,more”,pubid:“ ra-4dff56cd6bb1830b”};添加到候选列表链接永久链接http://dx.doi.org/10.1080/19648189.2012.688604

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号