首页> 外文期刊>Environmental Modelling & Software >Hydrographic survey methods for determining reservoir volume
【24h】

Hydrographic survey methods for determining reservoir volume

机译:确定水库容量的水文勘测方法

获取原文
获取原文并翻译 | 示例
       

摘要

Since the creation of the Texas Water Development Board (TWDB) hydrographic survey program in 1991, over 100 bathymetric surveys of Texas reservoirs have been conducted. From these surveys, reservoir volumes and surface areas for corresponding reservoir stages can be estimated, thus providing engineers, managers, and regulators with accurate knowledge of water availability. Volume differences derived from multiple surveys of individual reservoirs also provide estimates of capacity loss over time due to sedimentation. Completing each survey requires extensive field data collection and precise data analysis, which often limit the frequency with which surveys may be conducted. This paper serves to document the innovative survey methods used by the TWDB hydrographic survey group, including a presentation of the in-house HydroEdit software, which increases survey accuracy while drastically reducing the time required for data processing.
机译:自1991年创建德克萨斯州水开发委员会(TWDB)水文调查计划以来,已对德克萨斯州水库进行了100多次测深调查。从这些调查中,可以估算出相应储集层的储集层容积和表面积,从而为工程师,管理人员和管理人员提供准确的可用水知识。从单个储层的多次勘测得出的体积差异还提供了随时间推移由于沉积而造成的容量损失的估计值。完成每个调查都需要大量的现场数据收集和精确的数据分析,这通常会限制进行调查的频率。本文旨在记录TWDB水文调查小组使用的创新调查方法,包括内部HydroEdit软件的介绍,该软件可提高调查准确性,同时大大减少数据处理所需的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号