...
首页> 外文期刊>The Environmental Law Reporter >Non-Transmission Alternatives
【24h】

Non-Transmission Alternatives

机译:非传输选择

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Current transmission planning processes are unlikely to result in selection and implementation of non-transmission solutions, even where they are demonstrably superior. This shortcoming is obviously bad for proponents of distributed energy. It is also bad for those who hope to implement significant but thoughtful grid expansion in the coming decades. More transmission is critically needed to update infrastructure and to keep pace with renewable resource development, but each transmission line is also a fractious, expensive, and environmentally damaging endeavor. Where transmission can be avoided, it should be. FERC knows this, but has not yet translated its aspirations into effective regulations. Further reforms will be necessary to achieve true parity, and FERC should consider using its recently affirmed jurisdiction over practices affecting transmission rates to extend cost allocation to non-transmission alternatives. In the meantime, however, FERC needs a more forthright approach to non-transmission alternatives, which articulates the limitations of a stakeholder-driven comparable consideration mandate and seeks creative, collaborative solutions and reforms.
机译:当前的传输计划流程即使在明显优越的地方,也不太可能导致选择和实施非传输解决方案。这个缺点对于分布式能源的支持者显然是不利的。对于那些希望在未来几十年内实现重大而周到的电网扩展的人来说,这也是不利的。迫切需要更多的传输来更新基础结构并跟上可再生资源的发展,但是每条传输线也是一项艰巨,昂贵且对环境有害的工作。可以避免传播的地方应该这样做。 FERC知道这一点,但尚未将其愿望转化为有效的法规。为了实现真正的均等,有必要进行进一步的改革,FERC应该考虑利用其最近确认的管辖权来影响影响传输速率的做法,以将成本分配扩展到非传输替代方案。但是,与此同时,FERC需要一种更直截了当的方法来解决非传输替代方案,该方案阐明了利益相关者驱动的可比考虑任务授权的局限性,并寻求创新的协作解决方案和改革。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号