首页> 外文期刊>Environmental Geology >Countermeasures to treat collapse during the construction of road tunnel in fault zone: a case study from the Yezhuping Tunnel in south Qinling, China
【24h】

Countermeasures to treat collapse during the construction of road tunnel in fault zone: a case study from the Yezhuping Tunnel in south Qinling, China

机译:断裂带公路隧道施工中塌方的治理对策-以南秦岭野竹坪隧道为例

获取原文
获取原文并翻译 | 示例
       

摘要

To ensure the safety of the tunnel construction, it is very important to take the appropriate treatment measures after the collapse happened. Especially the tunnel goes through the fault fracture zone. This paper sets forth the process of the collapse that occurred in the Yezhuping Tunnel affected by the fault fracture zone and introduces the treatment for the collapse. The deformation characteristics of the surrounding rock are analyzed according to the monitoring results. Based on the research regarding the effect of the fault on the tunnel by using the general Hoek-Brown failure criterion and the field monitoring results, it is shown that the fault is the main reason for the collapse; it induces the attenuation of the Young modulus and the compressive strength and the enlargement of the plastic zone. The research results have some reference significance for similar projects.
机译:为了保证隧道施工的安全,塌方发生后采取适当的处理措施非常重要。特别是隧道穿过断层断裂带。阐述了野竹坪隧道受断层断裂带影响的塌方过程,并介绍了塌方的处理方法。根据监测结果分析了围岩的变形特征。在运用一般的Hoek-Brown破坏准则对断层对隧道的影响进行研究的基础上,结合现场监测结果,表明断层是造成倒塌的主要原因。它引起杨氏模量和抗压强度的衰减以及塑性区的扩大。研究结果对类似项目具有一定的参考意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号