首页> 外文期刊>Environment reporter >Utah Congressman Asks Chu to Postpone Shipment of Nuclear Waste to Utah Facility
【24h】

Utah Congressman Asks Chu to Postpone Shipment of Nuclear Waste to Utah Facility

机译:犹他州国会议员要求朱Chu基将核废料推迟运往犹他州的设施

获取原文
获取原文并翻译 | 示例
           

摘要

Rep. Jim Matheson (D-Utah) wrote to Secretary of Energy Steven Chu on Sept. 16 asking him to suspend shipments of depleted uranium, scheduled, to begin in October, to a nuclear waste disposal site in Utah.rn"I ask you to postpone plans to dispose of the Savannah River Site's depleted uranium until the Nuclear Regulatory Commission finishes its rulemaking process" to determine the appropriateness of sites for depleted uranium-disposal, Matheson wrote.rnIn July, the Savannah River Operations Office announced that "over the next 14 months," it would be shipping by rail approximately 14,800 drums of depleted uranium oxide "for final disposal" to a low-level radioactive waste disposal facility operated by Energy Solutions in Clive, Utah.
机译:众议员吉姆·马西森(D-Utah)于9月16日致函能源部长史蒂文·朱(Steven Chu),要求他暂停原定于10月开始运往犹他州核废料处置场的贫铀运输。 Matheson写道,将推迟处置萨凡纳河场贫铀的计划,直到核监管委员会完成其规则制定程序为止,以确定适合于处理贫铀场址。未来14个月”,它将通过铁路将大约14,800桶的贫化铀氧化物“最终处置”运至犹他州克莱夫市能源解决方案公司运营的低放射性废物处置设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号