A Virginia state court Aug. 10 invalidated one of the permits for a coal-fired power plant that Dominion Resources Inc. has been building for more than a year (Appalachian Voices v. State Air Pollution Control Board, Va. Cir. Ct., No. CL08-3530, 8/10/09).rnThe permit for a maximum achievable control technology (MACT) was approved in 2008 by the State Air Pollution Control Board with an "escape hatch" clause saying that if the federal limits on mercury emissions "are not achievable on a consistent basis under reasonably foreseeable conditions, then testing and evaluation shall be conducted to determine an appropriate adjusted maximum achievable annual emission limit."
机译:8月10日,弗吉尼亚州州法院裁定Dominion Resources Inc.已建设超过一年的燃煤电厂的许可证之一(阿巴拉契亚之声诉州空气污染控制委员会,弗吉尼亚州西尔克州,编号:CL08-3530,8 / 10/09)。rn最高可达到的控制技术(MACT)许可证于2008年由州空气污染控制委员会批准,并带有“逃生舱口”条款,规定如果联邦限制汞含量排放量“在合理的可预见的条件下不可能始终如一地实现,然后应进行测试和评估,以确定适当的调整后可达到的最大可达到的年度排放限值。”

著录项

  • 来源
    《Environment reporter》 |2009年第33期|1977-1977|共1页
  • 作者

    Alan Kovski;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号