The construction of new electricity-transmission infrastructure is construed in UK energy policy documents as necessary for achieving government targets to increase low-carbon electricity provision to combat climate change and ensure long-term energy security. Siting high-voltage overhead lines and substations is publicly controversial, however, due to their potential environmental, social, and economic impacts. Also controversial are issues of governance, procedural justice, and technological choice in decision making, particularly in light of recent legislative changes to the planning of nationally significant infrastructure projects in the UK. This study uses the Q-method to assess the discourses emerging from stakeholder and local community actor responses to line siting in the context of proposed transmission network upgrades in the southwest of England to support a new nuclear power station at Hinkley Point in Somerset. The analysis reveals three discourses, representing divergent positions on the adequacy of existing procedures to enable community participation, trust in network operators, the kinds of system configurations (centralised versus decentralised) required to meet the challenges of climate change and energy security, and the local impacts of overhead lines. Whilst the profile of how diverse respondents loaded upon each discourse showed expected patterns, the range of positions adopted by local residents support previous studies showing the limits of the 'NIMBY' conceptualisation of local protest. Whilst greater information provision and more upstream citizen participation in contexts of transmission line planning is recommended to enhance public trust, the limitations of such an approach in the absence of greater clarity at the national level regarding the configuration of future energy systems is discussed.
机译:为了实现政府增加低碳电力供应以应对气候变化和确保长期能源安全的政府目标,英国能源政策文件中解释了新的输电基础设施的建设。但是,由于架空高压架空线和变电站具有潜在的环境,社会和经济影响,因此一直存在争议。在决策过程中,治理,程序正义和技术选择等问题也引起争议,尤其是考虑到英国对国家重大基础设施项目的规划最近的立法变更。这项研究使用Q方法来评估利益相关者和当地社区参与者对线路选址的回应,这些讨论是在英格兰西南部提议的传输网络升级计划中进行的,以支持萨默塞特郡欣克利角的新核电站。分析揭示了三种话语,它们代表了在现有程序的充分性上的不同立场,以使社区参与,对网络运营商的信任,应对气候变化和能源安全挑战所需的系统配置类型(集中式与分散式)以及本地架空线的影响。尽管在每种话语中加载的不同受访者的状况显示出预期的模式,但当地居民所采用的立场范围支持了先前的研究,这些研究表明了“ NIMBY”概念对地方抗议活动的局限性。虽然建议在输电线路规划的背景下提供更多的信息和更多的上游公民参与以增强公众的信任,但是在国家层面上对未来能源系统的配置缺乏更加清晰的情况下,讨论了这种方法的局限性。

著录项

  • 来源
    《Environment and planning》 |2011年第4期|p.942-960|共19页
  • 作者单位

    Department of Geography, College of Life and Environmental Sciences, University of Exeter,Amory Building, Rennes Drive, Exeter, Devon EX4 4RJ, England;

    Department of Geography, College of Life and Environmental Sciences, University of Exeter,Amory Building, Rennes Drive, Exeter, Devon EX4 4RJ, England;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号