首页> 外文期刊>Inside EPA's environmental policy alert >DOE, Regulators Spar Over FY13 Cleanup Delays, Hinting At Bigger Battles
【24h】

DOE, Regulators Spar Over FY13 Cleanup Delays, Hinting At Bigger Battles

机译:美国能源部,监管机构在FY13清理延误方面保持沉默,暗示了更大的战斗

获取原文
获取原文并翻译 | 示例
       

摘要

The Energy Department (DOE) and its regulators are battling over a small but growing number of cleanup delays at several sites due to budget constraints imposed by the fiscal year 2013 continuing resolution (CR), hinting at even bigger disputes that could arise over much larger, long-term DOE-wide cleanup budget gaps in the future. DOE is already engaged in budget-driven cleanup disputes at Oak Ridge Reservation in Tennessee - where officials are battling EPA over whether DOE can unilaterally revise cleanup commitments under legally binding agreements - and at Los Alamos National Laboratory in New Mexico - where state regulators are threatening to impose penalties for DOE's failure to receive funds required to meet cleanup milestones.
机译:由于2013财年持续解决方案(CR)施加的预算限制,能源部(DOE)及其监管机构正在努力解决几个站点的少量但日益增多的清理延迟问题,这暗示着更大的纠纷可能会更大。 ,未来在DOE范围内的长期清理预算缺口。美国能源部已经在田纳西州的橡树岭保留地(Oak Ridge Reservation)内从事预算驱动的清理纠纷-官员们正在就美国能源部是否可以根据具有法律约束力的协议单方面修改清理承诺与美国环保署进行斗争-以及在新墨西哥州的洛斯阿拉莫斯国家实验室-州监管机构对此进行威胁对能源部未能收到满足清理里程碑所需的资金处以罚款。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号