首页> 外文期刊>Inside EPA's environmental policy alert >Appellate Ruling Sets High Bar For Efforts To Speed CWA Permit Reviews
【24h】

Appellate Ruling Sets High Bar For Efforts To Speed CWA Permit Reviews

机译:上诉裁决为加快CWA许可审查速度设定了高标准

获取原文
获取原文并翻译 | 示例
           

摘要

A federal court appears to have set a high bar for environmentalists to force regulators to revise discharge permits within the five-year statutory review period, rejecting a push to set a deadline for EPA to revise two permits after finding that its 17-year delay did not meet the bar of being an "extraordinary situation" that justifies issuance of an order. In a May 8 ruling in In Re: Sierra Club Inc., et al., the U.S. Court of Appeals for the 1st Circuit declined to grant a petition from environmentalists seeking a mandamus order requiring the agency to complete its National Pollutant Discharge Elimination System (NPDES) permit reviews for two coal-fired power plants - the Schiller plant in New Hampshire and the Mt. Tom plant in Massachusetts - even though the court raised concerns over EPA's delays. The ruling is available on InsideEPA.com. Seepage 2 for details. (Doc ID: 2434311).
机译:联邦法院似乎已为环保主义者设定了很高的标准,以迫使监管机构在五年法定审查期内修改排放许可证,但在发现EPA延误了17年后,却拒绝为EPA修改两个许可证规定最后期限不符合作为发出特殊命令的“特殊情况”的标准。在5月8日在In Re:Sierra Club Inc.等人的一项裁决中,美国第一巡回上诉法院拒绝给予环境保护主义者的请愿书,要求其要求作出死刑命令,要求该机构完成其国家污染物排放消除系统( NPDES)允许审查两个燃煤电厂-新罕布什尔州的席勒电厂和汤姆在马萨诸塞州的工厂-尽管法院对EPA的延误表示担忧。该裁定可在InsideEPA.com上找到。有关详细信息,请参见第2页。 (文档ID:2434311)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号