首页> 外文期刊>Engineers Australia >Bungaroo officially flowing
【24h】

Bungaroo officially flowing

机译:Bungaroo正式流动

获取原文
获取原文并翻译 | 示例
       

摘要

Rio Tinto's $330 million Bungaroo water facility in Western Australia has been officially opened, providing 10GL/a of water for the company's Pilbara iron ore coastal operations as well as the towns of Dampier and Wickham. The facility can be remotely managed from the company's Mesa J mine in the Pilbara region and its operations centre in Perth, with data telemetered to the Water Corporations Perth control centre. Rio Tinto chief executive iron ore, Japan, Korea and China, Andrew Harding, said the commissioning of this facility "secures a sustainable water source for the expansion of capacity towards 360Mt/a".
机译:力拓在西澳大利亚州耗资3.3亿澳元的Bungaroo自来水厂已正式启用,为公司的Pilbara铁矿石沿海业务以及Dampier和Wickham镇提供10GL / a的水。该设施可以从该公司位于Pilbara地区的Mesa J矿山及其位于珀斯的运营中心进行远程管理,数据遥测到水公司的珀斯控制中心。力拓公司首席执行官铁矿石在日本,韩国和中国的安德鲁·哈丁(Andrew Harding)表示,该工厂的投产“为将产能扩展至360Mt / a确保了可持续的水源”。

著录项

  • 来源
    《Engineers Australia》 |2014年第5期|28-28|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号