首页> 外文期刊>The Environmental Law Reporter >Flowing Water, Flowing Costs: Assessing FERC's Authority to Decommission Dams
【24h】

Flowing Water, Flowing Costs: Assessing FERC's Authority to Decommission Dams

机译:流动的水,流动的成本:评估FERC的水坝退役授权

获取原文
获取原文并翻译 | 示例
           

摘要

This year, 2019, marks the 20th anniversary of the removal of the Edwards Dam, one of the first functioning hydroelectric dam to be decommissioned and removed in the United States. It was also the first to be removed under the Federal Energy Regulatory Commission's (FERC's) asserted power to compel such a removal without compensation, an assertion raising legal questions that have yet to be fully resolved. As our hydroelectric infrastructure continues to age, these questions may again come to the forefront. Part I of this Comment considers the history of dam building in American culture and the development of the current federal statutory scheme that governs utility-operated, nonfederal hydroelectric infrastructure. Part Ⅱ considers FERC's and its predecessors' role in that statutory scheme, their asserted power to decommission dams unilaterally, and two case studies. Part Ⅲ analyzes the legal defensibility of FERC's 1994 Policy Statement asserting its authority to decommission dams, and the main arguments as to whether FERC can require utility operators to pay for a decommissioning that was ordered unilaterally or whether the government has to subsidize that removal.
机译:今年,2019年,是爱德华兹大坝拆除20周年,爱德华兹大坝是美国首座退役并拆除的水力大坝之一。这也是联邦能源监管委员会(FERC)宣称有权无偿强制执行这种清除的权力中的第一个被撤消的说法,这一说法引发了尚未完全解决的法律问题。随着我们水力发电基础设施的不断老化,这些问题可能再次成为最重要的问题。本意见的第一部分考虑了美国文化中水坝建设的历史以及目前管理由公用事业运营的非联邦水电基础设施的联邦法定计划的发展。第二部分考虑了FERC及其前身在该法定计划中的作用,他们单方面主张的拆除大坝的权力以及两个案例研究。第三部分分析了FERC的1994年《政策声明》的法律抗辩性,该声明声称其有权拆除大坝,并就FERC是否可以要求公用事业运营商为单方面下令的退役付款或政府是否必须补贴拆除提供了主要论点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号