首页> 外文期刊>Engineering news-record >Settlement Prepares the Way For Potential $800-Million Job
【24h】

Settlement Prepares the Way For Potential $800-Million Job

机译:解决方案为潜在的8亿美元工作铺平了道路

获取原文
获取原文并翻译 | 示例
       

摘要

Planning, design work and environmental reviews will begin immediately on a program to restore continuous flow to California's San Joaquin River following settlement of an 18-year-long legal dispute over operation of Friant Dam. The settlement agreement prepares the way for a 10-year program that could reopen the state's second-longest river to water transport and enable it again to sustain chinook salmon and other fish in a 153-mile stretch from the dam to the Merced River. The dam's construction in the 1940s largely dried up about 60 miles of river.
机译:在解决了长达18年的弗里安特大坝运营法律纠纷之后,计划,规划工作和环境审查将立即开始,以恢复加利福尼亚州圣华金河的持续供水。这项和解协议为一项为期十年的计划铺平了道路,该计划可以重新开放该州第二大河以水路运输,并使其能够再次维持从大坝到默塞德河的153英里长的奇努克鲑鱼和其他鱼类。大坝在1940年代的建设在很大程度上使河上的约60英里干dried。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号