首页> 外文期刊>Engineering news-record >New Orleans Levee Board Funds Review of Corps Work
【24h】

New Orleans Levee Board Funds Review of Corps Work

机译:新奥尔良大堤董事会对军团工作的审查

获取原文
获取原文并翻译 | 示例
       

摘要

The state-appointed authority over the levees and floodwalls of New Orleans' three big outfall canals will hire its own consultant to review the U.S. Army Corps of Engineers' assessment of seepage at a breach repaired after Hurricane Katrina. Southeast Louisiana Flood Protection Authority-East voted on July 17 to hire a consultant to evaluate seepage at two spots the Corps has been monitoring since the end of 2007. The areas are within a 690-ft replacement stretch of T-wall that was built according to the recommendations of the Corps-sponsored forensic investigative team, the Interagency Performance Evaluation Task Force.
机译:在新奥尔良的三个大排污渠的堤坝和防洪堤上,由州政府指定的机构将聘请自己的顾问,以审查美国陆军工程兵对卡特里娜飓风后修复的裂口渗流的评估。路易斯安那州东南部防洪局-东区于7月17日投票决定,聘请顾问来评估兵团自2007年底以来在两个地点进行的渗流评估。该地区位于T形墙的690英尺替代更换范围内,根据军团赞助的法医调查小组,机构间绩效评估工作组的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号