首页> 外文期刊>Engineering news-record >Mountaineer State Breaks Record in Segmental Spans
【24h】

Mountaineer State Breaks Record in Segmental Spans

机译:登山者状态打破了分段跨度的记录

获取原文
获取原文并翻译 | 示例
           

摘要

Engineers and contracting crews are breathing easier now that the most complex part has ended in building the $82-million Interstate 64 Kanawha River bridge project near Charleston, W.Va. With more than a year left to meet the project completion deadline, the bridge team already has secured a place in U.S. construction record books with a 760-ft main span of cast-in-place post-tensioned segmentai box girders. That span is the longest of its type in the country, surpassing Houston's Ship Channel Bridge by 10 ft.
机译:既然最复杂的部分已经结束,在华盛顿州查尔斯顿附近耗资8200万美元的64号州际公路卡纳瓦哈河大桥项目的建设中,工程师和承包商的工作人员将更加轻松自如,还需要一年多的时间才能完成项目的最后期限, 760英尺长的现浇后张紧分段箱梁已经跨过美国建筑记录簿。该跨度是该国最长的跨度,超过休斯顿的船海峡大桥10英尺。

著录项

  • 来源
    《Engineering news-record》 |2009年第13期|14|共1页
  • 作者

    Jim Parsons;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号