首页> 外文期刊>Engineering news-record >Often Overlooked Details that Stall or Stop Renewable Enerav Projects
【24h】

Often Overlooked Details that Stall or Stop Renewable Enerav Projects

机译:停滞或停止可再生Enerav项目的经常被忽略的细节

获取原文
获取原文并翻译 | 示例
       

摘要

Federal credits are increasingly structured to support solar, biomass and geothermal renewable energy projects, which in turn creates new opportunities for developers and the construction community.Yet, in the excitement to move forward many owners and developers overlook some key steps in the process before they commit time and money to a project.rnThe first is the cost and time to go through the permitting process, regardless of the project size. Nearly every owner and project team underestimates both-and the consequences can be catastrophic to a potential project. Environmental permitting can take up to 5 years and in some cases 8-10 years, depending on the overall scope of the project.
机译:联邦信贷越来越多地用于支持太阳能,生物质能和地热可再生能源项目,这反过来又为开发商和建筑界创造了新的机会。然而,令人兴奋的是,许多业主和开发商在此过程中忽略了一些关键步骤将时间和金钱投入到一个项目中。首先是不考虑项目规模的许可过程的成本和时间。几乎每个所有者和项目团队都低估了两者-后果可能对潜在项目造成灾难性影响。根据项目的总体范围,环境许可可能需要长达5年的时间,在某些情况下为8-10年。

著录项

  • 来源
    《Engineering news-record》 |2011年第9期|p.57|共1页
  • 作者

    Jack Hand;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号