首页> 外文期刊>Engineering news-record >London Calling: Crossrail Carries On
【24h】

London Calling: Crossrail Carries On

机译:伦敦致电:Crossrail继续进行

获取原文
获取原文并翻译 | 示例
       

摘要

Major European contractors have flocked to London for a piece of the 21-kilometer Crossrail tunnel project now advancing at more than 40 sites across the city. Billed as Europe's largest infrastructure project, Crossrail survived the U.K.'s toughest austerity drive in generations, in part because officials pushed back its schedule by a year. That move cut the estimated cost by around $1.6 billion, to $23 billion. The election of a new, budget-slashing U.K. government in May 2010 cast doubt on all state spending just as Crossrail was approaching its main procurement phase.
机译:欧洲主要承包商已蜂拥至伦敦,购买了21公里的Crossrail隧道项目,该项目目前正在全市40多个地点推进。作为欧洲最大的基础设施项目,Crossrail幸存了英国几代人最艰难的紧缩政策,部分原因是官员们将计划推迟了一年。此举将估计成本削减了约16亿美元,至230亿美元。正当Crossrail进入其主要采购阶段时,2010年5月,新的削减预算的英国政府当选,对所有国家支出产生了怀疑。

著录项

  • 来源
    《Engineering news-record》 |2012年第6期|p.8-10|共3页
  • 作者

    Peter Reina;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号