Crossrail project: the impact of 4–18 Bishop’s Bridge Road on the new Elizabeth line, London, UK

机译:Crossrail项目:4-18主教的桥梁路在新伊丽莎白线,伦敦,英国的影响

获取原文
获取原文并翻译 | 示例
       

摘要

This paper describes the interaction of the Crossrail project to deliver London's new Elizabeth line in the UK with a building situated directly over the machine-bored tunnels, close to Paddington station. The initial scheme called for the demolition of the existing building at 4-18 Bishop's Bridge Road, including extraction of existing piles, which would have had a considerable impact on the local area. Changes in the design of the Elizabeth line station at Paddington allowed a revised strategy to be considered, whereby the building could be kept, reducing construction costs to the project considerably. A combination of desk study and ground investigation works was used to identify the likely extent of the piling under the building, and to predict the risk of clashes with the tunnels. The results of analyses considering the impact of construction works on the building, and associated monitoring results are presented. The decision not to demolish produced numerous benefits aside from the reduction in cost, including a considerably reduced impact on those using the building and adjacent areas.
机译:本文介绍了CrossRail项目在英国在英国提供伦敦新伊丽莎白线的互动,靠近帕丁顿站靠近机器钻孔隧道的建筑物。初步计划要求在4-18个主教的桥路拆除现有建筑,包括提取现有桩,这对当地有相当大的影响。帕丁顿伊丽莎白线站设计的变化允许考虑修订的策略,可以保存建筑物,将建筑成本降低到项目。桌面研究和地面调查工程的组合用于确定建筑物下堆积的可能程度,并预测与隧道冲突的风险。提出了考虑建筑工程对建筑物的影响以及相关监测结果的分析结果。除了降低成本之外,决定不会产生许多益处,包括对使用建筑物和邻近地区的人的影响很大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号