首页> 外文会议>European conference on soil mechanics and geotechnical >The Lambeth Group in the Crossrail Project of London, UK - the geological model
【24h】

The Lambeth Group in the Crossrail Project of London, UK - the geological model

机译:英国伦敦Crossrail项目中的Lambeth集团-地质模型

获取原文

摘要

Crossrail will provide a high frequency, high capacity train service serving 40 stations and linking Reading and Heathrow in the west of London, to Shen field and Abbey Wood in the east. Over-ground sections of the route will be linked via twin, 21km tunnels up to 40m below central London and involving the excavation of circa 8M m3 of soil. The central London tunnelled section of this project has involved, since 2000, the specification for, drilling and interpretation of 1,043 new ground investigation boreholes. Information from a further 653 boreholes by third parties or historic sources have also been incorporated into the ground model. Approximately 10 km of the tunnel route is within the sediments of the Lambeth Group and more than 10,700 tests have been undertaken on these sediments alone. This paper summarises the Lambeth Group ground model for the project including new interpretations. It highlights geological risks that were identified and quantified beforehand so that mitigation measures could be adequately integrated into the design and construction processes. It also highlights areas where project cost and programme optimisation could be implemented as a result of the detailed ground information available. The paper, therefore, provides invaluable information for other projects within these complex sediments. A sister paper by Menkiti et al. (in preparation) will provide an update of the advanced geotechnical behaviour and properties of the Lambeth Group soils.
机译:Crossrail将提供高频率,高容量的火车服务,为40个车站提供服务,并将伦敦西部的雷丁和希思罗机场与东部的Shen Field和Abbey Wood连接起来。这条路线的地面部分将通过两条长达21公里的隧道连接起来,延伸至伦敦市中心以下40m,涉及挖掘约8M m3的土壤。自2000年以来,该项目位于伦敦市中心的隧道部分涉及1,043个新地面勘测钻孔的钻探和解释规范。第三方提供的来自另外653个钻孔的信息或历史资料也已纳入到地面模型中。隧道路线的大约10公里位于Lambeth组的沉积物中,仅这些沉积物就进行了10,700多次测试。本文总结了该项目的Lambeth Group地面模型,包括新的解释。它突出显示了事先确定和量化的地质风险,以便可以将缓解措施充分整合到设计和施工过程中。它还重点介绍了由于可获得详细的地面信息而可以实施项目成本和计划优化的领域。因此,本文为这些复杂沉积物中的其他项目提供了宝贵的信息。 Menkiti等人的姊妹论文。 (准备中)将提供Lambeth Group土壤的高级岩土行为和特性的更新。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号