首页> 外文期刊>Engineering news-record >A LEADER DEMANDS INNOVATION TO UPGRADE VITAL RIVER PASSAGE
【24h】

A LEADER DEMANDS INNOVATION TO UPGRADE VITAL RIVER PASSAGE

机译:领先者需要创新来升级河道通行

获取原文
获取原文并翻译 | 示例
       

摘要

When Bruce Bennett became executive project director for the joint venture of URS Corp., San Francisco, and Alberici Constructors, St. Louis, his task was to build the dam section of Olmsted Locks and Dam. He was bound by certain contract constraints-namely, no cofferdams. The contract required construction "in the wet," which meant that Bennett had to figure out a way to lift, move, lower and secure the 5,000-ton concrete shells that form the dam, which stretches 2,596 feet across the Ohio River.
机译:当布鲁斯·本内特(Bruce Bennett)成为旧金山URS Corp.和圣路易斯的Alberici Constructors合资企业的执行项目总监时,他的任务是建造Olmsted Locks和Dam的大坝部分。他受到某些合同约束的约束,即没有围堰。该合同要求“湿地”施工,这意味着贝内特必须想出一种方法来举升,移动,降低和固定构成大坝的5000吨混凝土外壳,该大坝横跨俄亥俄河,全长2596英尺。

著录项

  • 来源
    《Engineering news-record》 |2012年第2期|p.39|共1页
  • 作者

    Luke Abaffy;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:52

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号