首页> 外文期刊>Engineering news-record >LA DOTD Uses Barge-Based Containment System to Rehab Canal Bridges
【24h】

LA DOTD Uses Barge-Based Containment System to Rehab Canal Bridges

机译:LA DOTD使用基于驳船的围护系统修复运河桥梁

获取原文
获取原文并翻译 | 示例
           

摘要

The historic LA 24 Little Caillou Bayou and LA 661 Bayou LaCarpe vertical lift bridges in Houma, Terrebonne Parish, La., are undergoing complete cleaning, painting and structural repairs as part of an over $2-million Louisiana Dept. of Transportation and Development (LA DOTD) rehabilitation project. A key part of the project involves removing the lead-based coating off of 39,777 sq ft of structural steel surfaces on the 112-ft Little Caillou Bayou Bridge and the 196-ft Bayou LaCarpe Bridge.
机译:位于路易斯安那州特雷博讷教区侯马的历史悠久的LA 24 Little Caillou Bayou和LA 661 Bayou LaCarpe垂直升降桥正在接受彻底的清洁,涂漆和结构维修,作为路易斯安那州交通与发展部总投资超过200万美元的一部分(LA DOTD)修复项目。该项目的关键部分包括在112英尺的Little Caillou Bayou桥和196英尺的Bayou LaCarpe桥上的39,777平方英尺的钢结构表面上去除铅基涂层。

著录项

  • 来源
    《Engineering news-record》 |2013年第17期|53-53|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号