首页> 外文期刊>Engineering news-record >Complex Courthouse Built with Comprehensive Formwork Package
【24h】

Complex Courthouse Built with Comprehensive Formwork Package

机译:带有综合模板套件的综合法院大楼

获取原文
获取原文并翻译 | 示例
       

摘要

The soon-to-be-completed Justice Banning Center in Banning, Calif., is a culmination of more than five years of planning and design to replace the current Banning Courthouse and enable the court to improve access and security. The six-courtroom, 68,000-sq-ft facility is a Division of State Architect (DSA) permitted project. It has structural concrete walls, steel beams and concrete slabs on metal decks, and the various trades had to coordinate carefully during construction to ensure a precise interface of beams to walls.
机译:加利福尼亚州班宁市即将完工的司法班宁中心,是经过五年多的规划和设计的高潮,以取代现有的班宁法院大楼,并使法院能够改善出入和安全性。六间房间,占地68,000平方英尺,是美国国家建筑师局(DSA)批准的项目。它在金属甲板上有结构混凝土墙,钢梁和混凝土板,在建造过程中必须认真协调各个行业,以确保梁与墙的精确连接。

著录项

  • 来源
    《Engineering news-record》 |2013年第14期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号