首页> 外文期刊>Engineering news-record >Recycled Water Conversion Project Adopts Over-Insertion Protection
【24h】

Recycled Water Conversion Project Adopts Over-Insertion Protection

机译:循环水转化项目采用过度插入保护

获取原文
获取原文并翻译 | 示例
       

摘要

Camino Del Sur Recycled Water Conversion Project in San Diego, Calif., included the installation of 2,548 LF of 16-in. PVC recycled water main to facilitate the conversion of existing purple water pipe system to a recycled water system. The 16-in. PVC pipe would be pushed through a 30-in. HDPE casing from an 18 ft deep trench box. The casing included a 1209.7-ft radius for a length of 250 ft. The engineer specified Mega-Stop® bell over-insertion protection system from EBAA Iron to facilitate the use of standard PVC pipe without concern for over-belling, a common cause of pipe failures. The Mega-Stop system allows for expansion/contraction of the pipe and permitted joint deflection using an expansion retention spring.
机译:位于加利福尼亚州圣地亚哥的Camino Del Sur再生水转化项目包括安装2548 LF的16英寸LF。 PVC循环水主要用于促进将现有的紫色水管系统转换为循环水系统。 16英寸PVC管将被推入30英寸。 HDPE套管来自一个18英尺深的沟槽箱。套管的半径为1209.7英尺,长度为250英尺。工程师指定了EBAA Iron的Mega-Stop®钟罩过度插入保护系统,以方便使用标准PVC管而无需担心钟罩过度现象,这是造成这种情况的常见原因管道故障。 Mega-Stop系统允许使用膨胀保持弹簧使管道膨胀/收缩,并允许接头挠曲。

著录项

  • 来源
    《Engineering news-record》 |2013年第14期|28-28|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号