首页> 外文期刊>Engineering news-record >Pipeline Projects Shifting to Short-Haul Work, B&V Notes
【24h】

Pipeline Projects Shifting to Short-Haul Work, B&V Notes

机译:管道项目转向短途工作,B&V注意

获取原文
获取原文并翻译 | 示例
       

摘要

Most of the new oil and natural-gas pipelines that get financed and built over the next few years will be short-haul projects that address regional constraints, not die much longer projects that helped drive the sector in the past, says Peter Abt, Black & Veatch managing director in charge of the firm's oil and gas strategy practice. Abt, who oversaw B&V's "2013 Strategic Direction in the North American Natural Gas Industry" report, also believes that only a few of the more than 20 liquefied-natural-gas export terminal projects now being planned actually will be constructed.
机译:布莱克·彼得·阿伯特(Peter Abt)表示,在未来几年内获得资金和建造的大部分新石油和天然气管道将是解决区域限制的短途项目,而不会消亡更长久的过去推动该行业发展的项目。 &Veatch董事总经理,负责公司的石油和天然气战略业务。 Abt负责监督B&V的“ 2013年北美天然气行业战略方向”报告,他还认为,目前正在计划的20多个液化天然气出口码头项目中,只有少数几个会真正建设。

著录项

  • 来源
    《Engineering news-record》 |2013年第14期|19-19|共1页
  • 作者

    Housley Carr;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号