首页> 外文期刊>Engineering news-record >Multi-Year Plant Overhaul Demands Multi-Faceted Formwork
【24h】

Multi-Year Plant Overhaul Demands Multi-Faceted Formwork

机译:多年的工厂大修需要多面的模板

获取原文
获取原文并翻译 | 示例
       

摘要

The Metropolitan Water Reclamation District of Greater Chicago (MWRD) is in the midst of a multi-year upgrade and expansion to its Calumet Water Reclamation Plant (WRP) and surrounding supply network. The oldest of seven wastewater treatment facilities in metropolitan Chicago, the Calumet plant must expand to meet current and projected treatment capacity needs while using less energy and improving operations. At the inception of the project in 2009, the contractor F.H. Paschen, SN Neilsen & Associates (Paschen) knew it would need a variety of formwork components to facilitate the complex construction that includes an enclosed grit building and 12 new 155-ft-dia cast-in-place reinforced concrete, circular primary settling tanks, as well as several interconnecting service tunnels for piping and electrical conduits and tunnel-access pump stations.
机译:大芝加哥大都会水回收区(MWRD)正在进行多年的升级和扩建,以扩大其Calumet水回收厂(WRP)和周围的供水网络。 Calumet工厂是芝加哥都市圈中七个废水处理设施中最古老的一个,必须进行扩建,以满足当前和预期的处理能力需求,同时使用更少的能源并改善运营。在2009年项目开始时,承包商FH Paschen,SN Neilsen&Associates(Paschen)知道它将需要各种模板组件来促进复杂的施工,包括封闭的砂砾建筑和12座新的155英尺直径铸件就地钢筋混凝土,圆形主要沉降池,以及用于管道和电气导管的多个互连服务隧道以及通往隧道的泵站。

著录项

  • 来源
    《Engineering news-record》 |2013年第9期|53-53|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:42

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号