首页> 外文期刊>Engineering news-record >Privately Funded Replacement Bridge Improves Inter-City Travel
【24h】

Privately Funded Replacement Bridge Improves Inter-City Travel

机译:私人资助的替代桥改善了城际旅行

获取原文
获取原文并翻译 | 示例
       

摘要

Virginia's South Norfolk Jordan Bridge over the Elizabeth River connects Chesapeake and Portsmouth via a high-level fixed-span toll bridge. Opened in October 2012, it replaces a deficient lift bridge that was closed to traffic in 2008. The new structure was built in less than two years and was paid for through private funding provided by Figg Bridge Developers and Britton Hill Partners. Built using balanced cantilever construction, the concrete segmental bridge was entirely precast. "There were several cranes on site to keep everything moving," says Tom Hopkins with PVE Cranes & Services, Ltd. One of the PVE cranes on site included a 275-ton Kobelco 7250 model crane.
机译:弗吉尼亚州伊丽莎白河上的南诺福克郡约旦大桥通过一座高水平固定跨度收费桥将切萨皮克和朴次茅斯连接起来。它于2012年10月开放,取代了2008年停运的不足的举升桥。新​​结构的建造不到两年,并由Figg Bridge Developers和Britton Hill Partners提供的私人资金支付。采用平衡的悬臂结构建造,混凝土分段桥完全预制。 PVE Cranes&Services,Ltd.的汤姆·霍普金斯(Tom Hopkins)说:“现场有几台起重机,以保持一切运转。”现场的一台PVE起重机包括一台275吨的Kobelco 7250型起重机。

著录项

  • 来源
    《Engineering news-record》 |2013年第9期|58-58|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号