首页> 外文期刊>Engineering news-record >Bracing for Long Clear-Span Projects
【24h】

Bracing for Long Clear-Span Projects

机译:大跨度项目的支撑

获取原文
获取原文并翻译 | 示例
       

摘要

Designed to be used for large clear-span projects, such as cast-in-place projects (bridge footings, pump stations), soil remediation, large tank installations and linear applications, the GME MD Brace is a cost- and time-saving system compared to traditional weld and cut systems. Each ring consists of encased hydraulic rams and static extensions. The number of rings, which a registered professional engineer determines, can be stacked on top of each other during initial installation to help speed up installation time. With the addition of GME's 100-ton and 165-ton struts, projects that exceed 60 ft in length are now possible. The GME MD Brace is designed and engineered to use with a variety of steel sheet piles, enabling users to use existing sheet pile stock, saving time and money. In addition, the MD Brace system can be used in conjunction with traditional weld and cut systems. In particular, for projects that require phasing (an addition of a ring of braces, only meant to be in place for a short period), the MD Brace will save installation and removal time.
机译:GME MD Brace设计用于大型净跨项目,例如现浇项目(桥梁基础,泵站),土壤修复,大型储罐安装和线性应用,是一种节省成本和时间的系统与传统的焊接和切割系统相比。每个环由密封的液压柱塞和静态延伸部分组成。由注册专业工程师确定的环的数量可以在初始安装过程中相互叠放,以帮助加快安装时间。通过添加GME的100吨和165吨支撑杆,现在可以进行长度超过60英尺的项目。 GME MD Brace设计和制造为可与各种钢板桩配合使用,使用户能够使用现有的钢板桩库存,从而节省时间和金钱。此外,MD Brace系统可与传统的焊接和切割系统结合使用。特别是,对于需要定相的项目(增加一圈支撑,仅意味着在短时间内就位),MD Brace将节省安装和拆卸时间。

著录项

  • 来源
    《Engineering news-record》 |2014年第14期|56-56|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:15

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号