首页> 外文期刊>Engineering news-record >Digital Collaboration Supports One of the Fastest Hospital Builds in U.S.
【24h】

Digital Collaboration Supports One of the Fastest Hospital Builds in U.S.

机译:数字协作支持美国最快的医院之一

获取原文
获取原文并翻译 | 示例
       

摘要

Mortenson Construction was tasked with building the 831,000-sq-ft Saint Joseph Hospital replacement facility in Denver in 30 months-one of the fastest hospital builds in the U.S. Leveraging digital project communication was critical to the team's ability to open the new hospital doors by the end of 2014. Mortenson embraced technology to streamline review processes. They held meetings projecting 3D models of plans and allowed designers, general contractors and trade partners to mark the PDFs of models up at the same time in a cloud-based environment using Bluebeam Revu. People on the jobsite participated, as did people in offices 20 miles away.
机译:Mortenson Construction的任务是在30个月内在丹佛建造831,000平方英尺的圣约瑟夫医院替代设施,这是美国建设最快的医院之一。利用数字项目通信对团队通过医院打开新医院门的能力至关重要。 2014年底。Mortenson采用了简化审核流程的技术。他们举行了会议,对计划的3D模型进行了投影,并允许设计师,总承包商和贸易伙伴使用Bluebeam Revu在基于云的环境中同时标记模型的PDF。现场工作的人们都参加了会议,而20英里之外的办公室中的人们也参加了会议。

著录项

  • 来源
    《Engineering news-record》 |2015年第8期|56-56|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号