首页> 外文期刊>Engineering news-record >Tied Arch Solution for a Mississippi River Landmark
【24h】

Tied Arch Solution for a Mississippi River Landmark

机译:密西西比河地标的捆绑拱解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Elegant, graceful, iconic. Those are the words Martin Furrer, P.E., S.E., uses to describe the unusual Hastings Bridge that crosses the Mississippi River at Hastings, Minn. As the lead bridge design engineer at Parsons, he was responsible for the project's intricate design. The project was completed for the Minnesota Dept. of Transportation (MnDOT) by the joint venture construction team of Lunda Construction of Black River Falls, Wis., and Ames Construction of Burnsville, Minn., with Parsons as the lead designer.
机译:优雅,优美,标志性。这些是Martin Furrer,P.E.,S.E.用来形容横跨明尼苏达州黑斯廷斯的密西西比河的不寻常的黑斯廷斯大桥的经历。作为帕森斯的首席桥梁设计工程师,他负责该项目的复杂设计。明尼苏达州交通运输部(MnDOT)的项目是由威斯康星州黑河瀑布的伦达建筑公司和明尼苏达州的伯恩斯维尔的艾姆斯建筑公司的合资建筑团队完成的,帕森斯为首席设计师。

著录项

  • 来源
    《Engineering news-record》 |2015年第17期|62-63|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号